2 lean-workstations with fully automated process workflows and chaining processes
- Manual equipping and removing
- Automatic lubrication of steering tube and splined shaft via splash valves
- Installation of the tooth-husk onto the splined shaft, verification by camera
- Step-by-step spinning operation of the steering tube while constant examination of the sliding force
- Testing of the splined shaft length
- Testing of the steering shaft’s thread
- Applying of a data matrix code
- Coupling onto the management system